WELCOME TO
Spartan Commerce Park is an institutional quality class-A industrial facility in a prime location on I-26. Located within 3 miles of I-85, and nestled adjacent to an Amazon fulfillment center. Accessed along John Dodd Road (S-60), the project is served by a newly constructed right turn lane with a full access 40’ wide driveway. I-26 features a full diamond intersection.
At Spartan Commerce Park, our mission is to provide businesses of all sizes with the tools and space needed to succeed. We understand that the right environment plays a crucial role in business growth and productivity. That's why we strive to create a workspace that promotes collaboration, innovation, and flexibility. By offering top-notch facilities and services, we aim to support our tenants in achieving their goals.
Spartan Commerce Park is located within Wingo Industrial Park. This Park includes heavy industrial and distribution companies such as Amazon, Walmart Return Center, Master Gardner, Yusen Logistics, Camping World, and Contec, Inc. The location is ideal for a wide range of flex, shallow bay industrial, manufacturing and distribution users. This building is powered and ready for quick occupancy upon delivery. Contact our team today for more information and to schedule an appointment.
Spartan Commerce Park is located within Wingo Industrial Park. This Park includes heavy industrial and distribution companies such as Amazon, Walmart Return Center, Master Gardner, Yusen Logistics, Camping World, and Contec, Inc. The location is ideal for a wide range of flex, shallow bay industrial, manufacturing and distribution users. This building is powered and ready for quick occupancy upon delivery. Contact our team today for more information and to schedule an appointment.
Warehousing/Distribution/Industrial Permitted
No
Spartanburg
±226,800 SF
1,080' x 210'
Yes (12,000, 24,000, 36,000, 48,000)
±2,721 SF Spec Office
±23.45 A
54' x 50'/54' x 60' Speed Bay
32'
"Very Flat" Floor Surface Classification (FF 56 Flatness & FL 46 Levelness)
6" Thick 4,000 PSI over Full 10 Mil Vapor Barrier, Hardened and Includes Heavy Duty Joint Filler
Approval Pending
LED - 30 FC at 30" Above Floor
100% ESFR / Sprinklers - 16.8"K"
60 (9' x 10')/25 Air Powered Levelers / 3 Mech Levelers
2 (12' x 14') (4 Additional Available)
258 Spaces (1.14 Spaces / 1,000 SF)
59 Spaces (Fully Paved Concrete)
135' Deep with 60' Concrete Apron Gas: Piedmont Natural Gas
Inman Campobello Water
SSSD - Laterals Extended to Provide Service to Dock Area
480/277V 3ph 4w/ Duke Energy
Existing Transformer Provides for 2,500+ Amps.
60 Mil TPO with Enhanced Fastening